SE HEALTH: Cafeteria Renovation
Renovation of the main kitchen and dining facility for SE HEALTH. Project consisted of complete demolition of the existing main kitchen and dining area. Herndon Electric provided electrical and auxiliary system services to a new portable temporary kitchen for use during construction. Expanded electrical capacity was installed by connecting to the facility’s main electrical services with minimal interruption to facility and clinical operations. The main kitchen and dining area were renovated and put back in service on schedule while the COVID 19 pandemic was ongoing.
Client
Contractor
Size
Location